[volunteergrid2-l] Node down 15.Jun.2012

Jody Harris jharris at harrisdev.com
Sat Jun 16 04:06:33 UTC 2012


Node down report for 15.Jun.2012

Node: jharris at harrisdev.com-Cat
Time down: unknown
Failure: Power outage
Details: Power outage lasted longer that UPS power
   - We were out of town for the evening
   - CMOS was set to restore to "Power Off" after power loss
   - CMOS has been configured to restore power to "Last State" after power loss

jody
----
Ph. 575-208-4567
- Think carefully.


More information about the volunteergrid2-l mailing list